Cayuse is excited to bring you SP v3.7.2, which is chock-full of requested bug-fixes! Please note: There are NO changes to SP DataConnect in this release.
Note |
Reported By |
The Research Suite branding has been updated to reflect our standing as Cayuse LLC, independent from Evisions Inc. |
|
Upon deleting an Award in SP, now all applicable references to that award are also removed from Data Connect. |
|
Project Primary Administrative Contact is no longer overwritten with the Primary Administrative Contact from the Proposal when an Award is created from the Proposal. |
UC Santa Cruz |
Departmental Authorization is now being recorded consistently in the Proposal Status History irrespective of whether or not a comment is made on the authorization decision. |
UC Merced |
Department Contacts view in Research Contacts no longer displays additional, errant role assignments. |
Morehouse, TJU, Memphis, UNT |
All areas where decimal places can be entered will now only show the number of places a user has entered rather than a default of four decimal places. |
|
Inadvertent double-clicking on the Add Note button in a Proposal’s Notes tab no longer creates duplicate notes. |
|
Inadvertent double-clicking on the Award Administration Attachment upload section no longer creates unintended duplicate attachments. |
|
Inadvertent double-clicking on the Workflow Event Submit button in the Awards area no longer creates duplicate Workflow Events. |
|
Inadvertent double clicking upon creating SP records (proposals, awards, projects) no longer creates unintended duplicate records. |
NYU, NAU, UNM |
Temp Account notification email now pulls from the correct Temp Account fields in the database. |
IIT |
Account notification emails are now appropriately showing as sent in the Emails (envelope) tab of the Accounts screen. |
IIT |
When navigating away from the proposal budget page, user is no longer asked to save changes when no changes were made. |
NAU, UC Santa Cruz |
Project and Award Statuses are now listed correctly on historical records in search results, even if those statuses have been archived. |
|
CS Review section updated to correctly display filtered criteria in Multi-Campus application mode. |
Tennessee |
Proposal status history now consistently shows status Unsubmitted assigned to new proposals. |
Merced, UNT, Oklahoma |
The applicable Parent Project number now populates in the Proposal Administration area when a new Award or Project record is created from the proposal. |
CCNY, EMU, Idaho State, IIT, Miami, NACCHO, NYU, RIce, TTU, TJU, UC Davis, U of South Alabama, Tennessee |
Proposal load times are no longer increased due to SP and 424 pairing. |
Tennessee |
The Project Title is no longer auto-populated with the Short Project Title entered on the IPF General Info Page. |
|
Awards By Unit report now returns the correct Sponsor Type. |
|
Sorting a Proposal Report by Sponsor Type no longer returns an error. |
|
Awards by Unit report now always includes the same Awards that would display in the user interface given identical parameters. |
UC Santa Cruz |
Awards by Unit Report no longer shows duplicate award records and proposals links now work. |
CSU Northridge, IIT |
Proposals by Unit Report now display report dates according to customer time zone. |
IIT |
Awards by Unit Report now exports to Excel without creating duplicate entries. |
UC Santa Cruz |
Unique date ranges no longer produce a ColdFusion timeout error when running Proposals by Sponsor Type Report. |
Ball State, NAU, Rice, Rowan |
SP Award reports now include an accurate list of proposals linked to a particular award. |
NACCHO |
Users who only have the Role Manager role in Research Contacts will now be able to assign roles in their applicable units without needing a secondary role. |
UC Davis |
Submit for Routing button is now only active when the proposal is complete and the Proposal’s status is either Unsubmitted or Re-opened. |
|
Sponsor names can no longer be edited from the Project Administration screen; Sponsors can only be selected using the Sponsor finder. |
UNM |
Users can no longer hand-key Sponsors in the Subcontract area of Project Administration. All Sponsors must be selected from the Sponsor Finder. |
Illinois State |
Create and Update times and dates are now saved and displayed uniformly in Workflow based on the customer’s home time zone. |
Illinois State |
Dates and times displayed in SP will now always be consistent with customer time zone. |
|
Time stamps for proposal authorization, attachment upload, and email sent time now consistently reflect the time as well as the date the action took place. |
|
Adjusting the Project End Date on the Project General Info tab now appropriately updates the End Date in the header of the Project Record. |
UC Merced |
When editing a Workflow Event, if the user chooses to reassign this workflow event as part of the edit action, the reassignment now occurs after all edits are complete and the workflow record is submitted. |
UC Davis |
Sponsor names that include apostrophes no longer cause errors in Workflow events. |
UC Davis |
Workflow correspondence now allows for more than one recipient in the To: field. |
UC Santa Cruz |